LessonsSupplementary Practice 17: Market Inspection, Evidential Scope, and Rhetorical PrecisionQuiz

كَتَبَ الْمُرَاقِبُ التَّقْرِيرَ مُؤَرَّخًا وَمُوَقَّعًا.
The inspector wrote the report, dated and signed.

The statement “the inspector wrote the report” is already complete. Describing it as dated and signed adds information that improves the usefulness and accountability of the report, an apt setting for tatmīm.

IḥtirāsTatmīm
Prevents a plausible wrong inferenceSupplies useful added detail
Safeguards intended scopeEnriches an already complete assertion

Not every additional qualification is protective iḥtirās. That label requires a genuine risk of misunderstanding.

Opening interactive controls...

Tatmīm adds useful detail to a complete statement

Supplementary Practice 17: Market Inspection, Evidential Scope, and Rhetorical Precision

كَتَبَ الْمُرَاقِبُ التَّقْرِيرَ مُؤَرَّخًا وَمُوَقَّعًا.
The inspector wrote the report, dated and signed.

The statement “the inspector wrote the report” is already complete. Describing it as dated and signed adds information that improves the usefulness and accountability of the report, an apt setting for tatmīm.

IḥtirāsTatmīm
Prevents a plausible wrong inferenceSupplies useful added detail
Safeguards intended scopeEnriches an already complete assertion

Not every additional qualification is protective iḥtirās. That label requires a genuine risk of misunderstanding.